In this guide, we will explain how to replace the H2S hotend heating assembly.
This guide is used when there is a problem with the hotend heating assembly.
Common issues that require replacing the H2S hotend heating assembly include:
IMPORTANT!
Always turn off the printer's power before performing any maintenance work, including maintenance on the printer's electronic components and toolhead wires. Performing such operations while the printer is powered on may cause a short circuit, resulting in damage to electronic equipment and safety hazards.
During maintenance or troubleshooting, you may need to disassemble components such as the hotend, exposing wires and electronic components. If they come into contact with each other or with other metal or electronic components while the printer is still powered on, a short circuit may occur. This will damage the printer's electronic components and cause other problems.
Therefore, be sure to turn off the printer and disconnect the power supply before performing any maintenance to prevent short circuits or damage to the printer's electronic components, ensuring that maintenance work is carried out safely and effectively. If you have any questions about this guide, please click here to submit a ticket, and we will reply promptly and provide assistance.
Unscrew the 3 screws of the part cooling fan, among which the 1 screw on the back is shared with the toolhead rear cover.
After loosening the screws, the fan will hang naturally. Do not pull the fan to avoid damaging the connector!
Please keep the tape as you will need to reattach it during installation.
Refer to this tutorial to remove the hotend.
Insert the part cooling fan cable into the cable clip;
Refer to this tutorial to install the hotend.
When inserting the hotend heating assembly, ensure it is aligned with the holes and not misaligned.
If the cable is too long, return to step 1 of the installation guide to fold the excess cable first.
To ensure everything is working properly, set the hotend temperature to 100°C. If the setting is successful, the corresponding temperature will be displayed on the screen.
It is recommended to perform a full calibration of the printer after this operation.
It is strongly recommended to clean the PEI textured plate before use as the print plate may have been contaminated during this process.
If you encounter problems during the installation of the new hotend heating assembly, please check the following potential issues and solutions:
Check the hotend heating assembly connector to ensure it is properly inserted.
Please refer to Step 5 Connect Cables.
The connector pins must be carefully aligned with the TH board.
If the problem persists, the thermistor wire may be damaged (white wire).
Check the hotend heating assembly connector to ensure it is properly inserted.
Please refer to Step 5 Connect Cables.
The connector pins must be carefully aligned with the TH board.
If the problem persists, the heater wire may be damaged (translucent wire).
Ensure the screws of the hotend heater assembly are tightened and that the heatbed leveling function is enabled before starting printing.
Please refer to H2S Series First Layer Printing Quality Issues and Solutions for more related issues and solutions.
We hope this guide provides useful information to help you solve the problem.
If you have any questions about this document, please contact our customer service team, and we will be happy to answer your questions and provide assistance!
Click here to access Bambu AI, and click here to submit a service ticket.